On 28th December 2024, Nautix Marine Team was engaged by the operators of MV Corxxxxxx to perform load testing on the vessel’s cargo cranes. The team mobilized with a 35-ton load test water bag and a calibrated load cell. Following a toolbox talk with the vessel’s master, the team safely and successfully conducted load testing on all four cargo cranes in compliance with ISO 4310 standards.
The testing was witnessed by the class surveyor, and upon completion, the cranes were handed over to the crew, duly certified for safe operation. This ensured the vessel’s cargo handling equipment was fully compliant and ready for continued service.